PHOTO LAB RENOVATION IN BUILDING NO. 6100 LOCATED AT THE WYOMING DEPARTMENT OF TRANSPORTATION,:
WORK INCLUDES BUT IS NOT LIMITED TO: EXCAVATION AND BACKFILL, CONCRETE SIDEWALKS, MISCELLANEOUS CARPENTER, BUILDING INSULATION, THROUGH-PENETRATION FIRES...
Greybull School Roofs:Buff Gymn / Middle School / Middle School Gym / Quigg Building
A project walk thru is mandatory for all bidding contractors. One walk thru will be held on November 25, 2008 at 2:00pm....
Salt Creek Heights Business Center ARAJPB Initial Flex Tenant Facility:
The specific improvements include the construction of an approximately 45,000 square foot steel building with an additional approximate 12,500 square foot of mezzanine. recommen...
The homeowner is requesting Electrical for a Remodel or Addition / Electrical Fixtures, Outlets, and Switches at a single-family residence located in Greybull, WY.
Refer to the homeowner's notes for additional project details.
Interested contractor...
New construction of a power plant in Kemmerer. Completed working plans call for the construction of a power plant building on an existing site.
The owner has determined a list of select general contractors to bid on this project. Invited general...
Site work and new construction of an educational facility in Pinedale. Conceptual plans call for a new 600-student elementary school.
This project is pending site acquisition and approval. There is currently no firm construction timeline and gen...
Site work and new construction of an educational facility in Sheridan. Plans call for a 31,000-square-foot academic building to include classrooms and labs that will house the hospitality management and culinary arts programs.
Funding was recentl...
Tenant improvements for an office space in Torrington. Conceptual plans call for the remodeling of an existing middle school into district administrative office space, which will also house the wrestling facilities.
The owner recently released an...
Tenant improvements for a community fitness center in Torrington. Conceptual plans call for the partial remodeling of a middle school which includes converting an old middle school gym and several classrooms into a community gymnasium facility.
T...
Site work and new construction of a library in Alta. Conceptual plans call for the construction of a 2,000-square-foot library including 1,500 square feet to accommodate library services and a 500-square-foot area for community meeting space.
A d...
This material may not be published, broadcast, rewritten, or redistributed in any medium without prior written consent of BidClerk, Inc.
Copyright 2008 BidClerk, Inc. All rights reserved.