The homeowner is requesting Garage Contractors / Garage Door Installation at a single-family residence located in North Matewan, WV.
Refer to the homeowner's notes for additional project details.
Interested contractors should contact the homeow...
Site work and new construction of a multi-residential development in Charleston. Completed plans call for the construction of a 150-unit dormitory building and a parking garage.
All trades are let....
Site work and new construction of an industrial development in Institute. Design plans call for the construction of a biodiesel fuel plant that will produce 30 million gallons annually.
Construction is expected to begin in March 2009. No inquirie...
The homeowner is requesting Vinyl Siding Repair / Vinyl Siding Repair at a single-family residence located in Martinsburg, WV.
Refer to the homeowner's notes for additional project details.
Interested contractors should contact the homeowner immedi...
The homeowner is requesting Carpentry Contractors / Framing at a single-family residence located in Yukon, WV.
Refer to the homeowner's notes for additional project details.
Interested contractors should contact the homeowner immediately via Phone ...
Tenant improvements for a fitness facility in Huntington. Completed working drawings call for the remodel of existing unfurnished space into an 6,000-square-foot locker room facility.
A mandatory pre-bid meeting is scheduled for November 19, 2008 ...
Renovation of an educational facility in Morgantown. Completed working drawings call for the renovation of the fifth floor of an existing university building. The project scope includes installing non-bearing interior partitions, ceiling tile, interi...
Site work and new construction of an office facility in Lewisburg. Construction documents call for the construction of a 100,000-square-foot, three-story, office building which includes office space, storage space, conference rooms, and restrooms.
...
Renovation of a municipal facility in Charleston. Conceptual plans call for the conversion of a municipal facility into a medical facility which includes office space, laboratory space, waiting areas, restrooms, and storage space.
No timeline for...
Renovation of an office facility in Lewisburg. Conceptual plans call for the conversion of an office facility into locker rooms and restrooms. Plans also include systems upgrades to the pool.
No timeline for construction has been established. N...
This material may not be published, broadcast, rewritten, or redistributed in any medium without prior written consent of BidClerk, Inc.
Copyright 2008 BidClerk, Inc. All rights reserved.